Lesson Plans for the Week of: August 20 - August 24

Differentiated Physics
Day
Topic
Assignments
Monday No School- only 9th grade attend classes  
Tuesday

-Short introduction
-Hand out books, go over rules and safety
-Fill out Student information sheet
-Take class pictures
-Demo penny lab
-explain how to use the computer interfacing equipment
-collect data- Students copy data from overhead screen.

-Plot data on graph paper, mass (g) on the vertical axis and the number of pennies on the horizontal axis

-Find an equation for the line of best fit

Wednesday

- JR homework
-Ask the students to answer the following questions about their graph as you sign the homework

    • did you connect the dots on your graph?
    • What is the meaning of the slope of your line?
    • What is the meaning of your Y intercept?

- Students start collecting data for the M&M lab (due Thursday)
-Answer questions on lab sheet
- Prepare a whiteboard for the M&M experiment
-Answer the following questions for the lab:
1) How much would 100 m&m’s weigh?
2) Given the weight of the bag, how many m&m’s are in the bag?
3) Given the cost of one bag, what would 1 kg of m&m’s cost?

-M&M lab due Thursday
Thursday

-JR M&M Lab
-Students start presenting their whiteboards for the M&M lab

  • Introduce yourself
  • Each person must participate in the presentation
  • Students not presenting take notes and summarize information presented

-On the big whiteboard introduce the concept of Math models
-Have each group write the math model for their data on the big whiteboard.

 
Friday -Finish presenting whiteboards on M&M
-Post lab talk
-Physics pretest on Monday August 27
-M&M lab with group summery and conclusion due Tuessday

 

Physics
Day
Topic
Assignments
Monday No School- only 9th grade attend classes  
Tuesday -Short introduction
-Hand out books, go over rules and safety
-Fill out Student information sheet
-Take class pictures
-Demo penny lab
-explain how to use the computer interfacing equipment
-collect data- Students copy data from overhead screen.

-Plot data on graph paper, mass (g) on the vertical axis and the number of pennies on the horizontal axis

-Find an equation for the line of best fit

Wednesday

- JR homework
-Ask the students to answer the following questions about their graph as you sign the homework

    • did you connect the dots on your graph?
    • What is the meaning of the slope of your line?
    • What is the meaning of your Y intercept?

- Students start collecting data for the M&M lab (due Thursday)
-Answer questions on lab sheet
- Prepare a whiteboard for the M&M experiment
-Answer the following questions for the lab:
1) How much would 100 m&m’s weigh?
2) Given the weight of the bag, how many m&m’s are in the bag?
3) Given the cost of one bag, what would 1 kg of m&m’s cost?

-M&M lab due Thursday
Thursday

-JR M&M Lab
-Students start presenting their whiteboards for the M&M lab

  • Introduce yourself
  • Each person must participate in the presentation
  • Students not presenting take notes and summarize information presented

-On the big whiteboard introduce the concept of Math models
-Have each group write the math model for their data on the big whiteboard.

 
Friday -Finish presenting whiteboards on M&M
-Post lab talk
-Physics pretest on Monday August 27
-M&M lab with group summery and conclusion due Tuessday

 

Pre IB-Physical / GeoScience
Day
Topic
Assignments
Monday

-9th grade orientation
-Pick up LPS safety handout

  • Bring home and fill out the back page
  • Have parent sign back page
  • Bring it back by Wednesday
 
Tuesday

- Short introduction
-Take class picture
-Class rules and safety rules
-Temperature activity

  • procedure
  • collect temp data every ½ minute for 5 minutes
  • graph data for homework (temp on the vertical and time on the horizontal) Due Wednesday
  • What can you tell from the graph?
  • Do the data points form a straight line?
-Graph data for homework (temp on the vertical and time on the horizontal) Due Wednesday
- Information sheet due Thursday
Wednesday

-Hand in temp graph
-Hand in safety contract
- Go over web site, how to access: http://isite.lhs.lps.org/jrynear/
-Science research project
-Observation activity

  • Burning candle
  • Black light
  • Two can demo
  • Why does Tony sink?
 
Thursday

-Hand in student information sheet
-Talk about the scientific method and the roll observation plays in it
-Computer interfacing

  • Logger Pro
  • Collecting mass data
  • Displaying data
  • Making sense of your results
 
Friday

-Finding the average mass of a rock

  • Collect data
  • Graph data
  • Put whiteboard together
  • Present your results to the class